Cruise Plan
From: ralong@sdcc3.ucsd.edu
X-Sender: ralong@sdcc3.ucsd.edu (Unverified)
Mime-Version: 1.0
Date: Fri, 10 Nov 1995 14:59:58 -0800
To: shipsked@mail.ucsd.edu
Subject: Azam cruise, revised cruise plans (20 Nov and 29 Nov)
Cruise Plan (Revised 8 Nov 95)
R/V R. G. Sproul 20 Nov 95
20 Nov 95
0600 Load the ship
0615 Depart
1000 Arrive at first station, sample 2 hr
1300 Arrive at second station, sample 2 hr
1530 Arrive at third station, sample 1hr
1700 At Scripps Pier transfer samples and members of the scientific
party to shore
1900 Dock
Location
San Diego
Station 1 117¡ 40' W 32¡ 52' N
Station 2 117¡ 32' W 32¡ 52' N
Station 3 117¡ 17' 30" W 32¡ 52' N
Experiments
The cruise is designed to collect seawater to study microbial processes and
particles. We will require that the ships sewage holding tanks be kept
closed 5 minutes prior to reaching the stations and remain so until
sampling is completed. We wish to unload samples and members of the
scientific party at Scripps Pier.
At each station an XBT is to be deployed. Then up to six water samples
will be taken with Niskin bottles deployed on a hydrowire at each station
(maximum depths for each station being 800, 700, and 40 m).
List of Participants
David C. Smith,C.S. Post-doc Researcher. SIO
Ulla Li Zweifel Post-doc Researcher. SIO
Richard A. Long Grad Student/ R.A. SIO
Janice Y. Chung Undergraduate student UCSD
Internet: shipsked@ucsd.edu
WWW: http://sio.ucsd.edu/
shipsked@ucsd.edu