Cruise Plan

Date: Mon, 17 Apr 95 19:34:47 PDT From: gld@mpl.UCSD.EDU (Gerald D'Spain) To: rdufour@ucsd.edu, shipsked@sio.ucsd.edu Subject: Our Upcoming Use of R/V Sproul Cc: deane@mpl.UCSD.EDU, dick@mpl.UCSD.EDU, dorman@mpl.UCSD.EDU, sauter@mpl.UCSD.EDU

Dear Ship Scheduling,

Below is a tentative list of personnel and a schedule for our upcoming use of the Sproul. Please let me know if you have any questions or see any problems. In particular, we are assuming that it is acceptable to leave port at 11 pm next Monday.

Captain Zimm and Seth Mogk have been briefed and been given detailed deployment schedules for the F/O cable and SRP arrays by Dick Harriss.

We'd like to request that the RIB boat be available on board. It will provide a backup for the Center for Coastal Studies small craft being used during the deployments, as well as provide a water taxi to Oceanside harbor.

Gerald D'Spain

----------------------------------------------------------------

Personnel on board ------------------ Gerald D'Spain Dick Harris Gerry Denny Larry Corning LeRoy Dorman Allan Sauter Sharon Escher one other person Grant Deane Wayne Crawford

-----------------------------------------------------------------------

Tentative Schedule (all times PDT) ----------------------------------

Mon, 24 Apr load Sproul 23:00, 24 Apr Sproul departs Marfac for Bird Rock site

Tues, 25 Apr 01:00 : recover two Wayne Crawford sensors and proceed to Camp Pendleton 06:00 : arrive at Camp Pendleton and begin F/O cable deployment 12:00 : begin two SRP array deployments end of daylight : must stop SRP array deployment if not completed deploy the 4 Dorman OBS's in the vicinity of SRP array deployment site (site will be 2-3 km off coast and in about 20 m water depths)

Wed, 26 Apr 6 am : begin deployment of any uncompleted SRP array deployments check out and begin deployment of 8 moored sonobuoys end of day : Transfer Dick Harriss off by water taxi at Oceanside harbor Deploy two Wayne Crawford gravimeters (site will be 4-5 km off coast in about 200 m water depths)

Thurs, 27 Apr finish deployment of 8 moored sonobuoys depart for San Diego

Fri, 28 Apr offload Sproul


Internet: shipsked@ucsd.edu
WWW: http://sio.ucsd.edu/
shipsked@ucsd.edu