  DATE                    DOCUMENTS SENT

 12/12/95                 Check-off list
                  
 2/20/96                  Pre-cruise letter w/forms
                  
 3/8/96                   Chief Scientist letter
                  
 4/9/96                   Post-cruise letter w/forms
                  
 N/A                      Foreign clearance package
                  
************************************************************                 
Date: Thu, 4 Apr 1996 12:54:19 -0800
From: kris@odf.UCSD.EDU (Kristin Sanborn)
To: mohman@ucsd.edu
Subject: MOCNESS use -- 11 April deadline
Cc: kris@odf.UCSD.EDU, woodys@odf.UCSD.EDU, sylvia@sio.UCSD.EDU
Mime-Version: 1.0

Dr. Ohman,
As an attempt to reply to the message of 3 April to Woody
Sutherland, Erika Wilson asked if I was aware of the specifics on your upcoming
expedition.

Woody and I discussed your cruise before he went on vacation.  Woody will be
going out with you.  He has made arrangements with Dave Griffith at SWFS for
their MOCNESS system.  As I understand the situation, Dave will be able to
assist Woody in the setup for your cruise.  The ODF Cruise Request was in the
works, but was not finalized before Woody went on vacation.

I was not privy to the request for the CTD package so unfortunately that will
have to wait until Monday before Woody responds.

Kristin
**********************************

Date: Wed, 3 Apr 96 14:29:40 PST
X-Sender: mohman@coast.ucsd.edu
Mime-Version: 1.0
To: woodys@odf.ucsd.edu
From: mohman@ucsd.edu (Mark D. Ohman)
Subject: MOCNESS use -- 11 April deadline
Cc: eswilson@ucsd.edu, sylvia@sio.ucsd.edu

Woody-
This repeats the contents of my phone messages.  A reminder that I have a
cruise on the Sproul for SIO271 on 13 April.  Since I have a separate cruise
on the Sproul the day before we will need to have the MOCNESS system fully
set up and working by Thursday, 11 April.   I haven't been able to reach
Dave Griffith, but I assume that you have everything in order for use of
SWFSC's MOCNESS. 


So, I will need:
   1 m^2 MOCNESS with 10 333-um nets and cod ends, flow meter, etc.   
    At least one spare net, spare cod ends, etc.
    CTD package
    Fluorometer
    It would be preferable to have the plotter connected up for real time
profiles of T,S, & fluorescence.

We will deploy the MOCNESS from the 0.322 conducting wire.  We will deploy
other nets (bongo, Manta net) from the hydrowire.

Let me know if you have any questions.

Mark Ohman
x42754
********************************************************

Change Slips

POC: Rose Dufour/Elizabeth Rios
Scripps Institution of Oceanography
La Jolla, CA 92093-021078
TEL: (619) 534-2841 FAX: (619) 822-5811
Internet: shipsked@ucsd.edu
WWW: http://sio.ucsd.edu/supp_groups/shipsked/

To: Dr. Mark Ohman

Date: 20 December 1995

Ship: R/V Robert G. Sproul

Cruise Dates: January 29 1996

Change to: January 18, 1996

Other changes/notes: Moved to accommodate Terrill Cruise


Internet: shipsked@ucsd.edu
WWW: http://sio.ucsd.edu/