Date: Fri, 11 Jul 1997 12:14:28 -0700 X-Sender: mohman@coast.ucsd.edu Mime-Version: 1.0 To: Sylvia McDonaldFrom: mohman@ucsd.edu (M.D.Ohman) Subject: Re: cruise plan Preliminary cruise plan for OASIS 2 in Saanich Inlet: We will conduct a series of alternating OASIS (optical-acoustic submersible imaging system) and MOCNESS profiles to assess the small-scale spatial dispersion of zooplankton in relation to oxygen gradients in Saanich Inlet. OASIS profiles will be made while the Sproul is tied up to a mooring in ca. 225 m. of water. MOCNESS profiles will be made underway, spaced closely in time and space with OASIS profiles. Additional work will assess spatial patchiness of zooplankton using continuous ADCP mapping and MOCNESS tow-yos and assess horizontal gradients of dissolved oxygen with CTD-O2-fluorescence sections along the entire length of the Inlet. CTD-rosette casts will assess phytoplankton and bacterial pigments. An autonomous profiling vehicle and GPS drifter will be used to map vertical current shear and horizontal velocities. Ancillary experiments will done with live zooplankton. Mark Ohman with Jules Jaffe Extra note for Captain Zimm: We will rotate some of the science party using the whaler to pick up at the IOS dock. A visiting scientist from IOS (Dario Stucchi) is expected aboard for 1 day. ********************************** X-Sender: lzimm@popmail.ucsd.edu Mime-Version: 1.0 Date: Mon, 7 Jul 1997 06:01:26 -0800 To: Elizabeth Rios From: lzimm@ucsd.edu (Louis H. Zimm) Subject: Re: Pac Northwest Summer cruise Liz, Here are my corrections to the Ohman-Jaffe cruise notes. They are in parens.( ) Thanks, Louie Summer Work on Sproul Simenstad & Ohman Jaffe Present: Capt. Althouse, Capt. Zimm, J. Jaffe, M. Ohman, A. DeRobertis , M. Latz, R. Wilson, L. Butler, Rose Dufour, Woody Sutherland Topic: Loading/unloading and logistics for the Summer Sproul Cruises Simenstad will have 3 vans loaded when Sproul leaves San Diego. The Ohman/Jaffe van, (and mooring equipment),and MOCNESS equipment will be trucked up to Astoria for loading. Simenstad plans to arrive 19 July, and be off by 0800 on 20 July. The 20th will be dedicated to loading the Ohman-Jaffe equipment. The ship has agreed to depart after loading. This will have Sproul arriving in (IOS Patricia Bay) to embark the reminder of personnel by 0800 on 22 July. The transit time from Astoria to the (Strait of Juan de Fuca) is 19 hours. ( The transit time to IOS is 28-32 hours.) The IOS docks will be used again. Departure am 22 July. M. Ohman will initiate the contact for use of these facilities. Small scientific party will ride ship from Astoria to Sydney (IOS) A small avon is needed to run personnel back from IOS. The Ohman Jaffe cruise will be two legs. The last 48 hours will be dedicated to Jaffe and Franks. Ohman and some scientific personnel will depart the ship on 2 August. Science plan: 22 July CTD section 23 July mooring deployment Discussion followed on mooring deployment. Four people will be available to deploy mooring. Lynn Butler, Fred Uhlman, Jim Potts, and possibly a Sproul mate. Commercial divers should be hired in case of fouled lines (King brothers). If an ADCP is needed, it will need to be installed (at IOS) and removed at (IOS). Divers should be prepared for this evolution. STS provides computer for the ADCP. Capt. Zimm suggested that more weight (chain) be (used) this time for mooring deployment. (2 shots.) (Chain was on board but not used last summer). Mooring will be pulled up (pm) on 4th. It was agreed that Sproul would return to port (IOS) by 1800. Sproul will depart after scientific party disembarks. [Extra people need to be available to do the job] (Canadian) Customs will take about (2) hours. We will (most likely clear U.S.) customs in San Diego. Sproul should be in San Diego the evening of 10th or am on 11th. The ship will be off loading in San Diego. Latz will depart late (morning) on 11th, to return on am of 12th.